A having contracted with B to supply B with 1000 tons of iron at 100 Rs. a ton, to be delivered at a stated time, contracts with C for the purchase of 1000 tons of iron at 80 Rs. a ton, telling C that he requires so for the purpose of performing his contract in B. C fails to perform, A will be entitled to

A.
Loss with he suffered @ Rs. 20 per ton
B.
No compensation
C.
Compensation for loss of profit alongwith any damages which he might have to pay to B on account of breach
Answer
D.
None of the above

Answer: Option C

Solution

Answer: Option C