A powerhouse originally built for Rs. 4,00,000 is to be replaced by a new one. The total cost of consturction is Rs. 14,00,000. But the estimated cost of construction of the original size powerhouse at present is Rs. 6,00,000. The revenue cost will be

A.
Rs. 4,00,000
B.
Rs. 4,50,000
C.
Rs. 5,00,000
D.
Rs. 6,00,000
Answer

Answer: Option D