At a surface mine office the independent Sound Pressure Level (SPL) measured in dB(A) on account of 3 drill machines are 85,88 and 85. If all the three machines work simultaneously, the combined SPL, in dB (A) is

A.
91
Answer
B.
90
C.
92
D.
94

Answer: Option A