Q368
Find the incorrect pair List-I List-II a. Jamuria Asansol Project 1. Solar b. Gosaba Project 2. Bio energy c. Purulia Kistobazar Project 3. Thermal d. Freserganj Project 4. Wind
Find the incorrect pair
| List-I | List-II |
| a. Jamuria Asansol Project | 1. Solar |
| b. Gosaba Project | 2. Bio energy |
| c. Purulia Kistobazar Project | 3. Thermal |
| d. Freserganj Project | 4. Wind |
A.
a-1
B.
b-2
C.
c-3
AnswerD.
d-4
Answer: Option C
Solution
Answer: Option C
Solution:
WBGEDCL has set up its first solar photo and voltaic cell plant at Jamuria in Asansol (Bardhaman).
Gosaba Project is a biogas power plant in South 24 Parganas district.
Purulia Kistobazar Project is a hydro-electric project in Purulia district.
The first wind farm project is set up at Freserganj area of West Bengal.