Q307
For ship vessel industry the following layout is best suited
A.
Process layout
B.
Product layout
C.
Fixed position layout
AnswerD.
Plant layout
Answer: Option C
Solution
Answer: Option C
Solution:
In a fixed position layout, personnel, supplies and equipment are brought to the site where the product will be assembled, rather than the product being moved through an assembly line or set of assembly stations.Other fixed position layout examples include construction shipbuilding, aircraft, aerospace, farming, drilling for oil, home repair and automated car washes.