Q36
If m men can do a work in r days, then the number of days taken by (m + n) men to do it is :
A.
B.
C.
Answer
D.
Answer: Option C
Solution
Answer: Option C
Solution:
M1 × D1 = M2 × D2mr = (m +n) × D2
D2 =