If m men can do a work in r days, then the number of days taken by (m + n) men to do it is :

A.
B.
C.
Answer
D.

Answer: Option C

Solution

Answer: Option C
Solution:
M1 × D1 = M2 × D2
mr = (m +n) × D2
D2 =