Vidyalelo
Computer Science · Q75

System Analysis And Design

Engineering and GATE · Computer Science · question 75

Q75

In a Decision tree

A.
the root is drawn on the left and is the starting point on the decision sequence
B.
the branch, to be followed, depends on the conditions and decisions, to be made
C.
the nodes represent the conditions, with the right wise of tree listing the actions to be taken
D.
All of the above
Answer
E.
None of the above

Answer: Option D

Solution

Answer: Option D
No explanation is given for this question Let's Discuss on Board