Vidyalelo
Civil Engineering · Q3

Highway Engineering

Engineering and GATE · Civil Engineering · question 3

Q3

In CBR test the value of CBR is calculated at

A.
2.5 mm penetration only
B.
5.0 mm penetration only
C.
7.5 mm penetration only
D.
both 2.5 mm and 5.0 mm penetrations
Answer

Answer: Option D

Solution

Answer: Option D
No explanation is given for this question Let's Discuss on Board