In centrifugal pump installation,

A.
Pump is properly primed before starting
B.
The diameter of the pipe at inlet as well as at outlet, is kept smaller than the delivery pipe
C.
The motor may burn out if it is started with empty delivery pipe and with open gate valve
D.
All the above
Answer

Answer: Option D

Solution

Answer: Option D
No explanation is given for this question Let's Discuss on Board