In chain survey the tie line is primariy provided to . . . . . . . .

A.
Check accuracy ot the survey
B.
Take offsets for detailed survey
Answer
C.
Avoid long offsets from other chain links
D.
Increase the number of chain lines

Answer: Option B

Solution

Answer: Option B