Q729
In process and job costing system, normal spoilage cost is considered as
A.
conversion costs
B.
sunk costs
C.
inventoriable costs
AnswerD.
non inventoriable costs
Answer: Option C
Solution
Answer: Option C
Solution:
In process and job costing system, normal spoilage cost is considered as inventoriable costs. Inventoriable costs are included in the cost of a product