Q109
In the construction of the Oresund Bridge, what key geological factor was considered?
A.
Bedrock depth in marine sediments
AnswerB.
Permafrost
C.
Volcanic activity
D.
Soil contamination
Answer: Option A
Solution
Answer: Option A
Solution:
The Oresund Bridge project required careful assessment of bedrock depth below marine sediments for anchoring bridge piers and the tunnel section.