In the given figure drill holes, heading, mucking and benching are numbered as 1, 2, 3, 4; The correct sequence is:

In the given figure drill holes, heading, mucking and benching are numbered as 1, 2, 3, 4; The correct sequence is:
Tunnel Engineering mcq question image
A.
4, 1, 2, 3
B.
1, 2, 3, 4
C.
4, 1, 3, 2
Answer
D.
3, 4, 1, 3

Answer: Option C