Vidyalelo
Geological Engineering · Q90

Case Studies and Applied Geological Engineering Projects

Engineering and GATE · Geological Engineering · question 90

Q90

In which case study was urban tunneling complicated by archaeological remains?

A.
Athens Metro Project
Answer
B.
NYC Second Avenue Subway
C.
Doha Metro
D.
Chennai Metro

Answer: Option A

Solution

Answer: Option A
Solution:
The Athens Metro project faced delays due to archaeological discoveries during excavation, which required careful documentation and rerouting of tunnels.