It is good practice to select a station where there is no area changes particularly on the upstream side (ventilation survey) should atleast.

A.
Five roadway diameter
Answer
B.
Eight roadway diameter
C.
Ten roadway diameter
D.
Two roadway diameter

Answer: Option A

Solution

Answer: Option A