Q328

Match the following. List-I (Element of Production) List-II (Elements) a. Control of due dates 1. Cribes b. Control of material 2. SQC c. Control of quality 3. EOQ d. Control of tooling 4. Scheduling

Match the following.
List-I (Element of Production) List-II (Elements)
a. Control of due dates 1. Cribes
b. Control of material 2. SQC
c. Control of quality 3. EOQ
d. Control of tooling 4. Scheduling
A.
a-1, b-2, c-3, d-4
Answer
B.
a-4, b-3, c-2, d-1
C.
a-1, b-3, c-4, d-2
D.
a-1, b-3, c-2, d-4

Answer: Option A

Solution

Answer: Option A
No explanation is given for this question Let's Discuss on Board