Pick up the correct reason for making conceptual (or preliminary) estimate from the following:

A.
To have a check on a definitive cost estimate
B.
To check quotations from contractors and/or sub-contractors
C.
To compute target estimate for the owner while drawing and specifications are in initial stage
D.
All of these
Answer

Answer: Option D

Solution

Answer: Option D