Vidyalelo
Aptitude · Q58

Mensuration 2d

Competitive Exams · Aptitude · question 58

Q58

The cost of levelling a circular field at 50 paise per square metre is Rs. 7700. The cost (in Rs.) of putting up a fence all round it at Rs. 1.20 per metre is ( Use = 227 )

The cost of levelling a circular field at 50 paise per square metre is Rs. 7700. The cost (in Rs.) of putting up a fence all round it at Rs. 1.20 per metre is
A.
Rs. 132
B.
Rs. 264
C.
Rs. 528
Answer
D.
Rs. 1056

Answer: Option C

Solution

Answer: Option C
Solution: