Engineering and GATE · Mining Engineering · question 214

Q214

The design of pit top and pit bottom layouts done basing on the following objects.

A.
Use of shaft full capacity
B.
Use of minimum number of tubs in circuit
C.
Minimum number of operatives
D.
Maintaining steady flow tubs
E.
All of above
Answer

Answer: Option E

Solution

Answer: Option E
No explanation is given for this question Let's Discuss on Board