Vidyalelo
Chemical Engineering · Q94

Mechanical Operations

Engineering and GATE · Chemical Engineering · question 94

Q94

The energy required per unit mass to grind limestone particles of very large size to 100 μm is 12.7 kWh/ton. An estimate (using Bond's law) of the energy to grind the particles from a very large size to 50 μrn is

A.
6.35 kWh/ton
B.
9.0 kWh/ton
C.
18 kWh/ton
Answer
D.
25.4 kWh/ton

Answer: Option C

Solution

Answer: Option C
No explanation is given for this question Let's Discuss on Board