Q36
The following information is provided for an ore deposit: Number of waste blocks = 10 Number of ore blocks = 5 Volume of each waste block, m3 = 600 Total cost of waste handling per m3 = Rs. 100 Tonnage of each ore block = 400 Total cost of ore handling per ton = Rs. 150 Sale price of ore per ton = Rs. 500 The net cash flow of mining the deposit in lakhs of rupees, is
A.
3.4
B.
2.5
C.
1.0
AnswerD.
0.8
Answer: Option C
Solution
Answer: Option C
No explanation is given for this question Let's Discuss on Board