Vidyalelo
Mining Engineering · Q552

Drilling and Blasting

Engineering and GATE · Mining Engineering · question 552

Q552

The isolation stoppings should be well locked into the roof, floor, sides the minimum depth of locking should be shale.

A.
30 cm
Answer
B.
50 cm
C.
15 cm
D.
1 m

Answer: Option A

Solution

Answer: Option A
No explanation is given for this question Let's Discuss on Board