Vidyalelo
Mining Engineering · Q218

Opencast Mining

Engineering and GATE · Mining Engineering · question 218

Q218

The line of intersection of the quarry side with its floor.

A.
Toe of highwall
Answer
B.
Open pit floor
C.
Trench
D.
Cut

Answer: Option A

Solution

Answer: Option A
No explanation is given for this question Let's Discuss on Board