Vidyalelo
Electrical Engineering · Q97

Economics Of Power Generation

Engineering and GATE · Electrical Engineering · question 97

Q97

The load factor of domestic load is usually

A.
10 to 15%
Answer
B.
30 to 40%
C.
50 to 60%
D.
60 to 70%

Answer: Option A

Solution

Answer: Option A
No explanation is given for this question Let's Discuss on Board