The main geological concern in the construction of the Gotthard Base Tunnel was:

A.
Volcanic intrusions
B.
Overburden heat
C.
Faulted zones
Answer
D.
Sinkholes

Answer: Option C

Solution

Answer: Option C
Solution:
The Gotthard Base Tunnel passed through several faulted zones with fractured and water-bearing rocks. These required real-time monitoring, reinforced linings, and drainage systems.