Vidyalelo
Mining Engineering · Q396

Drilling and Blasting

Engineering and GATE · Mining Engineering · question 396

Q396

The minimum pillar to pillar distance, if the depth of seam is 250 m and gallery width is 4.2 m.

A.
34 m
B.
30 m
C.
39 m
Answer
D.
45 m

Answer: Option C

Solution

Answer: Option C
No explanation is given for this question Let's Discuss on Board