Chemical Engineering · Q251

Process Equipment And Plant Design

Engineering and GATE · Chemical Engineering · question 251

Q251

The operating velocity in the absorption tower is usually 40-50% of the flooding velocity. Packed absorption towers are normally designed for a pressure drop of about __________ mm of water column per metre height of packing.

A.
1-5
B.
20-40
Answer
C.
100-150
D.
1000-1500

Answer: Option B

Solution

Answer: Option B
No explanation is given for this question Let's Discuss on Board