The overflow rate for plain sedimentation tanks is about

A.
500 to 750 liters/hour/m2
Answer
B.
1000 to 1250 liters/hour/m2
C.
1250 to 1500 liters/hour/m2
D.
1500 to 2000 liters/hour/m2

Answer: Option A

Solution

Answer: Option A