Q547
The railway line from Udhampur to Katra was completed in
A.
1980
B.
2000
C.
2005
D.
2014
AnswerAnswer: Option D
Solution
Answer: Option D
Solution:
In 2014, the Udhampur Katra rail link was opened for people. The length from Udhampur to Baramulla is 292 km and is divided into 3 sections.