Vidyalelo
Civil Engineering · Q173

RCC Structures Design

Engineering and GATE · Civil Engineering · question 173

Q173

The toe projection of foundation slabs is taken

A.
As one third of the base
Answer
B.
As one sixth of overall height of the wall
C.
Equal to heel slab
D.
Below ground surface

Answer: Option A

Solution

Answer: Option A
No explanation is given for this question Let's Discuss on Board