Q173
The toe projection of foundation slabs is taken
A.
As one third of the base
AnswerB.
As one sixth of overall height of the wall
C.
Equal to heel slab
D.
Below ground surface
Answer: Option A
Solution
Answer: Option A
No explanation is given for this question Let's Discuss on Board