Q438
Upper Bari Doab Canal Hydel Project comprises of hydro power stations of
A.
Two stages
AnswerB.
Three stages
C.
Four stages
D.
Five stages
Answer: Option A
Solution
Answer: Option A
Solution:
Upper Bari Doab Canal (UBDC) Hydel Project is located near Pathankot in Punjab. There are three power houses situated on this canal which draws water from Madhopur Headworks on Ravi river. This project comprises of two stages of hydro power stations. The total installed capacity of this project is 91.32 MW.