What caused delays in the Metro tunnel beneath the Hooghly River in Kolkata?

A.
Sandstone aquifers
B.
Basalt intrusions
C.
Water-bearing alluvial silt
Answer
D.
Seismic zone regulations

Answer: Option C

Solution

Answer: Option C
Solution:
The tunnel passed under the Hooghly River through water-bearing alluvial silt, leading to water ingress and requiring specialized TBMs and grouting.