What is the correct sequence of the following events of construction of a shaft in rock? 1) Drilling and blasting ii) Timbering iii) Pumping iv) Mucking Select the correct answer

A.
i, ii, iii, iv
B.
i, iv, ii, iii
Answer
C.
ii, i, iv, iii
D.
ii, iv, i, iii

Answer: Option B

Solution

Answer: Option B