Q145
What mitigation method was implemented at the Vajont Dam post-failure?
A.
Lowering reservoir level
AnswerB.
Installing drainage tunnels
C.
Complete demolition
D.
Relocation of dam site
Answer: Option A
Solution
Answer: Option A
Solution:
After the deadly landslide in 1963, authorities lowered the reservoir level permanently to reduce hydrostatic pressure and risk of future slope failure.