Q298
When was Durgam Cheruvu Bridge built?
A.
25th September, 2020
AnswerB.
25th September, 2021
C.
24th September, 2018
D.
None of these
Answer: Option A
Solution
Answer: Option A
Solution:
As per a report by Telangana Today, the Municipal Administration and Urban Development Minister K. T. Rama Rao launched the cable-stayed bridge on Durgam Cheruvu on 25th September, 2020.