Q316
When was NTPC Ramagundam established?
A.
1978
AnswerB.
1970
C.
1975
D.
None of these
Answer: Option A
Solution
Answer: Option A
Solution:
The NTPC Ramagundam was laid by the then Prime Minister Morarji Desai on 14th November, 1978 for the 200 MW power plant which was commissioned on 27th October, 1983.