Vidyalelo
Geological Engineering · Q134

Case Studies and Applied Geological Engineering Projects

Engineering and GATE · Geological Engineering · question 134

Q134

Which case study demonstrated successful river diversion for dam construction?

A.
Bhakra Dam
B.
Aswan Dam
C.
Hoover Dam
D.
Tehri Dam
Answer

Answer: Option D

Solution

Answer: Option D
Solution:
The Tehri Dam project required complex river diversion through twin tunnels due to challenging Himalayan terrain.