Q127
Which of the following is a wrong combination of location and hydroelectric projects undertaken by the NHPC?
A.
Baira Siul-Himachal Pradesh
B.
Salal-Jammu and Kashmir
C.
Loktak-Sikkim
AnswerD.
Devi Ghat-Nepal
Answer: Option C
Solution
Answer: Option C
Solution:
Loktak Power Station (3 x 35 MW) is a multipurpose storage scheme to harness the hydro power potential of Loktak lake fed by Khuga and Imphal river.