Q240
A can do a piece of work in 5 days less than the time taken by B to do it. If both of them together take 111/9 days, then the time taken by B alone to do the same work (in days ) is ?
A can do a piece of work in 5 days less than the time taken by B to do it. If both of them together take days, then the time taken by B alone to do the same work (in days ) is ?
A.
15 days
B.
20 days
C.
25 days
AnswerD.
30 days
Answer: Option C
Solution
Answer: Option C
Solution:
Try these question with the help of the option to save the timeLet B takes x days to complete the work
∴ A takes (x - 5)days
Now take the option 'B' i.e x = 20days
∴ Time taken by B = 20days and A = 15days
T.W = LCM of number of day taken by A and B = 60.
Work Efficiency ration A : B = 4 : 3
∴Total Time taken to complete the work together = = days
This option not matched with
Now take the option 'C' i.e x = 25days
∴ Time taken by B = 25days and A = 20days
T.W = LCM of number of day taken by A and B = 100.
Work Efficiency ration A : B = 5 : 4
∴Total Time taken to complete the work together = = days
Hence , Option (C) is the correct .