Q241
A takes 10 days less than the time taken by B to finish a piece of work. If both A and B can do it in 12 days, then the time taken by B alone to finish the work is = ?
A.
30 days
AnswerB.
27 days
C.
20 days
D.
25 days
Answer: Option A
Solution
Answer: Option A
Solution:
Let B can alone finish the work = x daysSo, A can alone finish the work = (x - 10) days
Now, one day work of A =
and one day work of B =
Now, given (A + B) can finish the work = 12 day
So, one day work of (A + B) =
if x = 4, then A alone can finish the work = 4 - 10 = -6, which is not possible.
So, x = 30
Hence, B can alone finish the work = 30 days