Q184
A CPM family includes
A.
CPA (Critical Path Analysis)
B.
CPP (Critical Path Plotted)
C.
CPS (Critical Path Scheduling)
D.
All of the above
AnswerAnswer: Option D
Solution
Answer: Option D
Solution:
A CPM family includes- CPA (Critical Path Analysis)
- CPP (Critical Path Plotted)
- CPS (Critical Path Scheduling)