A CPM family includes

A.
CPA (Critical Path Analysis)
B.
CPP (Critical Path Plotted)
C.
CPS (Critical Path Scheduling)
D.
All of the above
Answer

Answer: Option D

Solution

Answer: Option D
Solution:
A CPM family includes
- CPA (Critical Path Analysis)
- CPP (Critical Path Plotted)
- CPS (Critical Path Scheduling)