Vidyalelo
Civil Engineering · Q89

Estimating And Costing

Engineering and GATE · Civil Engineering · question 89

Q89

A portion of an embankment having a uniform up-gradient 1 in 500 is circular with radius 1000 m of the centre line. It subtends 180° at the centre. If the height of the bank is 1 m at the lower end, and side slopes 2 : 1, the earth work involved.

A.
26,000 m3
B.
26,500 m3
C.
27,000 m3
D.
27,500 m3
Answer

Answer: Option D

Solution

Answer: Option D
No explanation is given for this question Let's Discuss on Board