Vidyalelo
Civil Engineering · all questions

Estimating And Costing
practice.

Practice every MCQ with options. Use Show answers when you want the correct option and solution.

95

Questions

1/5

Page

Pick an option on a question to see the right answer and solution.

If the formation level of a highway has a uniform gradient for a particular length, and the ground is also having a longitudinal slope, the earthwork may be calculated by

Select an option to see the answer and solution.

Size, capacity and materials need be specified for

Select an option to see the answer and solution.

The expected out turn of 12 mm plastering with cement mortar is

Select an option to see the answer and solution.

The excavation exceeding 1.5 m in width and 10 sq.m in plan area with a depth not exceeding 30 cm, is termed as

Select an option to see the answer and solution.

If B is the width of formation, d is the height of the embankment, side slope S : 1, for a highway with no transverse slope, the area of cross-section is

Select an option to see the answer and solution.

The rate of payment is made for 100 cu m (per % cu m) in case of

Select an option to see the answer and solution.

Due to change in price level, a revised estimate is prepared if the sanctioned estimate exceeds

Select an option to see the answer and solution.

The value of 'A' of Indian type W.C. shown in the given figure is:
Estimating and Costing mcq question image

Select an option to see the answer and solution.

The value of 'C' of Indian type W.C. shown in the given figure is:
Estimating and Costing mcq question image

Select an option to see the answer and solution.

The value of 'B' of Indian type W.C. shown in the given figure is:
Estimating and Costing mcq question image

Select an option to see the answer and solution.

The area of the cross-section of a road fully in banking shown in the given figure, is
Estimating and Costing mcq question image

Select an option to see the answer and solution.

A cement concrete road is 1000 m long, 8 m wide and 15 cm thick over the sub-base of 10 cm thick gravel. The box cutting in road crust is

Select an option to see the answer and solution.

The concrete work for the following part of the building of specified thickness is measured in square meters

Select an option to see the answer and solution.

The expected out turn of cement concrete 1 : 2 : 4 per mason per day is

Select an option to see the answer and solution.

The expected out turn of half brick partition wall per mason per day is

Select an option to see the answer and solution.

The measurement is made in square metre in case of

Select an option to see the answer and solution.

The measurement is made for stone work in square metre in case of

Select an option to see the answer and solution.

As per Indian Standard Specifications, the peak discharge for domestic purposes per capita per minute, is taken

Select an option to see the answer and solution.

Pick up the correct statement in case of water supply.

Select an option to see the answer and solution.

The cost of the earthwork in excavation for the surface drain of cross-section shown in the given figure for a total length of 5 metres @ Rs. 450% cum, is
Estimating and Costing mcq question image

Select an option to see the answer and solution.