Vidyalelo
Mechanical Engineering · Q237

Engineering Drawing

Engineering and GATE · Mechanical Engineering · question 237

Q237

Approximately this much of the cost of product development and manufacture is determined at the design stage:

A.
40 - 50%
B.
60 - 75%
C.
70 - 80%
Answer
D.
75 - 85%

Answer: Option C

Solution

Answer: Option C
No explanation is given for this question Let's Discuss on Board