Q311
If direct material cost is 85000 and direct manufacturing labour is 25000, then prime cost would be
A.
$13,500
B.
$55,600
C.
$60,000
D.
$110,000
AnswerAnswer: Option D
Solution
Answer: Option D
Solution:
Prime cost = Direct material cost + Manufacturing labour = 25000 = $110,000