Vidyalelo
Mining Engineering · Q22

Mine System Engineering

Engineering and GATE · Mining Engineering · question 22

Q22

In an opencast mine loading and transporting has been carried out by shovel dumper combination. There is only one shovel is in operation. Dumpers arrive at the rate of 10 dumpers per hour and it takes shovel on an average 5 minutes to load a dumper. Assume arrival is Poisson and service time is exponentially distributed. Find the expected number of dumpers in the system.

A.
2
B.
3
C.
4
D.
5
Answer

Answer: Option D

Solution

Answer: Option D
No explanation is given for this question Let's Discuss on Board