Q179

In block caving operation the draw points are placed at 20 m centre to centre, with the pillar width 3.5 m as shown in figure below. The muck is assumed to have zero cohesion and 35 friction angle. The height of draw cone (h) in m is

In block caving operation the draw points are placed at 20 m centre to centre, with the pillar width 3.5 m as shown in figure below. The muck is assumed to have zero cohesion and 35 friction angle. The height of draw cone (h) in m is
Introduction to Mining Engineering mcq question image
A.
12.5
B.
14.6
C.
15.8
Answer
D.
16.5

Answer: Option C

Solution

Answer: Option C