Q20
In CPM, the cost slope is determined by
A.
B.
Answer
C.
D.
Answer: Option B
Solution
Answer: Option B
Solution:
The term 'cost-slope' is defined as the “increase in the cost of the activity per unit decrease in the time”.Cost slope =