Match the following List-I (Elements of Production Control) List-II (Elements) a. Control of Due Dates 1. Planned Schedules b. Control of Quality 2. Inspection c. Control of Tooling 3. Cribs d. Control of Materials 4. EOQ
Match the following
| List-I (Elements of Production Control) | List-II (Elements) |
| a. Control of Due Dates | 1. Planned Schedules |
| b. Control of Quality | 2. Inspection |
| c. Control of Tooling | 3. Cribs |
| d. Control of Materials | 4. EOQ |
A.
a-1, b-2, c-3, d-4
AnswerB.
a-3, b-4, c-2, d-1
C.
a-3, b-1, c-2, d-4
D.
a-1, b-4, c-3, d-2
Answer: Option A
Solution
Answer: Option A
No explanation is given for this question Let's Discuss on Board