Vidyalelo
Mechanical Engineering · Q45

Industrial Engineering And Production Management

Engineering and GATE · Mechanical Engineering · question 45

Q45

PMTP (predetermined motion time systems) include

A.
MTM (method time measurement)
B.
WFS (work factor systems)
C.
BNTS (basic motion time study)
D.
All of the above
Answer

Answer: Option D

Solution

Answer: Option D
Solution:
PMTP (predetermined motion time systems) include
- MTM (method time measurement)
-WFS (work factor systems)
- BNTS (basic motion time study)